INSTALLATION OF PUMPING PROJECT PUMPING STATION WATER SUPPLY SYSTEM SON TAY - HOA LAC - XUAN MAI - MIEU MON - HANOI - HA DONG WITH A CAPACITY OF 450,000 M3/DAY.

To ensure the safety of the raw water source for the Son Tay - Hoa Lac urban water supply system - Xuan Mai - Mieu Mon - Hanoi - Ha Dong when the Da River water level is low due to the impact of climate change and publicity Song Da Clean Water Investment Joint Stock Company (Viwasupco) has cooperated with the Southern Star Prayer Investment Joint Stock Company (STS Corp) rise/raw water pumping station Phase II with a capacity of 450,000 m3/day. Night.
After a long time of designing and calculating the installation, until January 2023, the team of engineers and workers at STS Corp transported and successfully installed two submersible pumps each pump q = 6,250 m3 /h, and an underground cable line for project activities.
Submersible pumps used at the design project of the emergency pumping station system of Son Tay urban chain water supply system - Hoa Lac - Xuan Mai - Mieu Mon - Hanoi - Ha Dong was selected from reliable suppliers, process 100% production and installed in Korea. The shell is equipped with stainless steel, which helps to limit damage during use. With materials available in Vietnam, the pump is easy to replace when there is a problem. In addition, when the temperature and humidity exceed the permitted level, the signal from the sensor arranged on the pump body will automatically transmit to the system, making the operation and control process easier.
With many years of experience in the profession and an inherent sense of responsibility, the team of engineers at STS Corp has been completed on schedule, quality assurance before handing over to the investor, bringing satisfaction Best for customers, and becoming a pioneer in providing green solutions in Vietnam.